GPT Infraprojects has received an contract of Rs 204 crore for Construction of Road Over Bridge (3 lane) with bridge proper (1x30m Composite Girder +1x60m Bow String Girder + 1x30m Composite Girder) and Bridge Approaches (17×24.6mPSC Girder + 3×20.6m PSC Girder) at Km: 15/22-24 in lieu of LC No. 13 between Andul-Sankrail Station and construction of Road Over Bridge (2 lane) with Bridge proper (1x18mComposite Girder + 1x60m Bow String Girder + 1x36m Composite Girder) and Bridge Approaches (18×25.36m PSC Girder + 2×10.0m RCC slab) at Km: 23/17-19 In Lieu of L.C No. 18 between NalpurBauria Stations of Howrah-Kharagpur section under the jurisdictionof Dy CE/Con/Garden Reach, South Eastern Railway, Kolkata.
Powered by Capital Market – Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content
Discover LocalTak, your trusted platform for timely news updates and comprehensive media insights. Stay informed with accurate reporting, insightful analysis, and in-depth coverage across a wide range of topics. Join us to stay ahead in an ever-changing world.